Vui lòng dùng định danh này để trích dẫn hoặc liên kết đến tài liệu này:
http://thuvienso.vanlanguni.edu.vn/handle/Vanlang_TV/18452
Nhan đề: | Exact Overlap Rate Analysis and the Combination with 4D BIM of Time-Cost Tradeoff Problem in Project Scheduling |
Tác giả: | Ma, Guofeng Zhang, Lingzhi |
Từ khoá: | Research Scheduling Design optimization Project management Cost analysis Strategy Genetic algorithms Product development Civil engineering Tradeoffs Optimization Construction industry Researchers Methods Concurrent engineering Building management systems Minimum cost Concurrency Dependence Feasibility studies Schedules |
Năm xuất bản: | 2019 |
Nhà xuất bản: | Hindawi Limited |
Tóm tắt: | Schedulers can compress the schedule of construction projects by overlapping design and construction activities. However, overlapping may induce increased total cost with the decrease of duration. To solve the concurrency-based time-cost tradeoff problem effectively, this paper demonstrates an overlapping optimization algorithm that identifies an optimal overlapping strategy with exact overlap rates and generates the required duration at the minimum cost. The method makes use of overlapping strategy matrix (OSM) to illustrate the dependency relationships between activities. This method then optimizes the genetic algorithm (GA) to compute an overlapping strategy with exact overlap rates by means of overlapping and crashing. This paper then proposes an integrated framework of genetic algorithm and building information modeling (BIM) to prove the practice feasibility of theoretical research. The study is valuable to practitioners because the method allows establishing a compressed schedule which meets the limited budget within the contract duration. This article is also significant to researchers because it can compute the optimal scheduling strategy with exact overlap rates, crashing degree, and resources expeditiously. The usability and validity of the optimized method are verified by a test case in this paper. |
Mô tả: | "Hindawi; Advances in Civil Engineering; Volume 2019, Article ID 9120795, 12 pages; https://doi.org/10.1155/2019/9120795" |
Định danh: | http://thuvienso.vanlanguni.edu.vn/handle/Vanlang_TV/18452 |
ISSN: | 1687-8086 1687-8094 (eISSN) |
Bộ sưu tập: | Bài báo_lưu trữ |
Các tập tin trong tài liệu này:
Tập tin | Mô tả | Kích thước | Định dạng | |
---|---|---|---|---|
BBKH1181_TCCN_Exact Overlap Rate Analysis ....pdf Giới hạn truy cập | Exact Overlap Rate Analysis and the Combination with 4D BIM of Time-Cost Tradeoff Problem in Project Scheduling | 1.2 MB | Adobe PDF | Xem/Tải về Yêu cầu tài liệu |
Khi sử dụng các tài liệu trong Thư viện số phải tuân thủ Luật bản quyền.