Nhan đề: Exact Overlap Rate Analysis and the Combination with 4D BIM of Time-Cost Tradeoff Problem in Project Scheduling
Tác giả: Ma, Guofeng
Zhang, Lingzhi
Từ khoá: Research
Scheduling
Design optimization
Project management
Cost analysis
Strategy
Genetic algorithms
Product development
Civil engineering
Tradeoffs
Optimization
Construction industry
Researchers
Methods
Concurrent engineering
Building management systems
Minimum cost
Concurrency
Dependence
Feasibility studies
Schedules
Năm xuất bản: 2019
Nhà xuất bản: Hindawi Limited
Tóm tắt: Schedulers can compress the schedule of construction projects by overlapping design and construction activities. However, overlapping may induce increased total cost with the decrease of duration. To solve the concurrency-based time-cost tradeoff problem effectively, this paper demonstrates an overlapping optimization algorithm that identifies an optimal overlapping strategy with exact overlap rates and generates the required duration at the minimum cost. The method makes use of overlapping strategy matrix (OSM) to illustrate the dependency relationships between activities. This method then optimizes the genetic algorithm (GA) to compute an overlapping strategy with exact overlap rates by means of overlapping and crashing. This paper then proposes an integrated framework of genetic algorithm and building information modeling (BIM) to prove the practice feasibility of theoretical research. The study is valuable to practitioners because the method allows establishing a compressed schedule which meets the limited budget within the contract duration. This article is also significant to researchers because it can compute the optimal scheduling strategy with exact overlap rates, crashing degree, and resources expeditiously. The usability and validity of the optimized method are verified by a test case in this paper.
Mô tả: "Hindawi; Advances in Civil Engineering; Volume 2019, Article ID 9120795, 12 pages; https://doi.org/10.1155/2019/9120795"
Định danh: http://thuvienso.vanlanguni.edu.vn/handle/Vanlang_TV/18452
ISSN: 1687-8086
1687-8094 (eISSN)
Bộ sưu tập: Bài báo_lưu trữ

Các tập tin trong tài liệu này:
Tập tin Mô tả Kích thước Định dạng  
BBKH1181_TCCN_Exact Overlap Rate Analysis ....pdf
  Giới hạn truy cập
Exact Overlap Rate Analysis and the Combination with 4D BIM of Time-Cost Tradeoff Problem in Project Scheduling1.2 MBAdobe PDFXem/Tải về  Yêu cầu tài liệu


Khi sử dụng các tài liệu trong Thư viện số phải tuân thủ Luật bản quyền.