Vui lòng dùng định danh này để trích dẫn hoặc liên kết đến tài liệu này: http://thuvienso.vanlanguni.edu.vn/handle/Vanlang_TV/18452
Toàn bộ biểu ghi siêu dữ liệu
Trường DCGiá trị Ngôn ngữ
dc.contributor.authorMa, Guofeng-
dc.contributor.authorZhang, Lingzhi-
dc.date.accessioned2020-05-29T03:41:11Z-
dc.date.available2020-05-29T03:41:11Z-
dc.date.issued2019-
dc.identifier.issn1687-8086-
dc.identifier.issn1687-8094 (eISSN)-
dc.identifier.otherBBKH1181-
dc.identifier.urihttp://thuvienso.vanlanguni.edu.vn/handle/Vanlang_TV/18452-
dc.description"Hindawi; Advances in Civil Engineering; Volume 2019, Article ID 9120795, 12 pages; https://doi.org/10.1155/2019/9120795"vi
dc.description.abstractSchedulers can compress the schedule of construction projects by overlapping design and construction activities. However, overlapping may induce increased total cost with the decrease of duration. To solve the concurrency-based time-cost tradeoff problem effectively, this paper demonstrates an overlapping optimization algorithm that identifies an optimal overlapping strategy with exact overlap rates and generates the required duration at the minimum cost. The method makes use of overlapping strategy matrix (OSM) to illustrate the dependency relationships between activities. This method then optimizes the genetic algorithm (GA) to compute an overlapping strategy with exact overlap rates by means of overlapping and crashing. This paper then proposes an integrated framework of genetic algorithm and building information modeling (BIM) to prove the practice feasibility of theoretical research. The study is valuable to practitioners because the method allows establishing a compressed schedule which meets the limited budget within the contract duration. This article is also significant to researchers because it can compute the optimal scheduling strategy with exact overlap rates, crashing degree, and resources expeditiously. The usability and validity of the optimized method are verified by a test case in this paper.vi
dc.language.isoenvi
dc.publisherHindawi Limitedvi
dc.subjectResearchvi
dc.subjectSchedulingvi
dc.subjectDesign optimizationvi
dc.subjectProject managementvi
dc.subjectCost analysisvi
dc.subjectStrategyvi
dc.subjectGenetic algorithmsvi
dc.subjectProduct developmentvi
dc.subjectCivil engineeringvi
dc.subjectTradeoffsvi
dc.subjectOptimizationvi
dc.subjectConstruction industryvi
dc.subjectResearchersvi
dc.subjectMethodsvi
dc.subjectConcurrent engineeringvi
dc.subjectBuilding management systemsvi
dc.subjectMinimum costvi
dc.subjectConcurrencyvi
dc.subjectDependencevi
dc.subjectFeasibility studiesvi
dc.subjectSchedulesvi
dc.titleExact Overlap Rate Analysis and the Combination with 4D BIM of Time-Cost Tradeoff Problem in Project Schedulingvi
dc.typeOthervi
Bộ sưu tập: Bài báo_lưu trữ

Các tập tin trong tài liệu này:
Tập tin Mô tả Kích thước Định dạng  
BBKH1181_TCCN_Exact Overlap Rate Analysis ....pdf
  Giới hạn truy cập
Exact Overlap Rate Analysis and the Combination with 4D BIM of Time-Cost Tradeoff Problem in Project Scheduling1.2 MBAdobe PDFXem/Tải về  Yêu cầu tài liệu


Khi sử dụng các tài liệu trong Thư viện số phải tuân thủ Luật bản quyền.