Vui lòng dùng định danh này để trích dẫn hoặc liên kết đến tài liệu này: http://thuvienso.vanlanguni.edu.vn/handle/Vanlang_TV/20337
Nhan đề: Study of Bridge Demolition DOT Survey and Available Standard Specifications
Tác giả: Rezaei, Nazanin
Garber, David
Từ khoá: Bridge
Civil Engineering
DOT Survey
Demolition
Available Standard Specifications
Năm xuất bản: 2019
Nhà xuất bản: Hindawi Limited
Tóm tắt: TherearemanydamagedbridgesintheUnitedStateswhichareeitherstructurallydeficientorfunctionallyobsoleteandrequire replacement or rehabilitation, many using accelerated bridge construction (ABC) techniques. Before a bridge is replaced or rehabilitated, the old structure or component needs to first be demolished. Although the AASHTO LRFD Bridge Design Specification presents minimum bridge design requirements, there is limited information about bridge demolition available for designersandcontractorsinthisfield.Morestudyisrequiredtodeterminebestpracticesindemolitionadministrationandavoid further unintentional events. This study presents the results from a survey prepared and disseminated through a research effort under the Accelerated Bridge Construction University Transportation Center (ABC-UTC). This survey was sent out to all State Departments of Transportation (DOTs). The results of the survey reveal the need for additional guidance in bridge demolition administrations at a national level. According to the results of this study, contractors are the most important part of bridge demolition projects from injuries, fatalities, and responsibility point of view.
Định danh: http://thuvienso.vanlanguni.edu.vn/handle/Vanlang_TV/20337
ISSN: 1687-8086
1687-8094 (eISSN)
Bộ sưu tập: Bài báo_lưu trữ

Các tập tin trong tài liệu này:
Tập tin Mô tả Kích thước Định dạng  
BBKH1561_TCCN_Study of Bridge.pdf
  Giới hạn truy cập
Study of Bridge Demolition DOT Survey and Available Standard Specifications1.54 MBAdobe PDFXem/Tải về  Yêu cầu tài liệu


Khi sử dụng các tài liệu trong Thư viện số phải tuân thủ Luật bản quyền.