Vui lòng dùng định danh này để trích dẫn hoặc liên kết đến tài liệu này: http://thuvienso.vanlanguni.edu.vn/handle/Vanlang_TV/19114
Toàn bộ biểu ghi siêu dữ liệu
Trường DCGiá trị Ngôn ngữ
dc.contributor.authorZheng, Chuanjun-
dc.contributor.authorYuan, Jingfeng-
dc.contributor.authorLi, Lingzhi-
dc.contributor.authorSkibniewski, Mirosław J.-
dc.date.accessioned2020-06-07T06:57:50Z-
dc.date.available2020-06-07T06:57:50Z-
dc.date.issued2019-
dc.identifier.issn1687-8086-
dc.identifier.issn1687-8094 (eISSN)-
dc.identifier.otherBBKH1456-
dc.identifier.urihttp://thuvienso.vanlanguni.edu.vn/handle/Vanlang_TV/19114-
dc.description"Hindawi Advances in Civil Engineering Volume 2019, Article ID 5958904, 21 pages https://doi.org/10.1155/2019/5958904"vi
dc.description.abstractAlthough the Chinese government at all levels has increasingly embraced Public-Private Partnership (PPP) as their preferred approach to deliver large-scale infrastructure since 2014, residual value risk (RVR) has been ignored in PPP practice. To systematically explore the critical risk factors (CRFs) responsible for measuring RVR in highway PPP projects, this paper proposes and refines a conceptual model composed of two risk dimensions (four risk categories) and 29 indicators through process-based viewpoint. Through literature review and expert interview, a structured questionnaire was developed to collect responses with rich working experience in construction industry or highway PPP projects. The refined measurement model with 21 CRFs was validated through mean value analysis (MVA) and confirmatory factor analysis (CFA) performed by SPSS 23.0 and AMOS 23.0, respectively. The findings indicate that 21 CRFs are significant in influencing RVR of highway PPP projects. Moreover, RVR from system dimension is mainly concentrating on institutional environment, macroeconomy, and relationship aspects, whereas financing in preconstruction, quality in construction, and market demand in operation are the most significant CRFs in nonsystem dimension. Furthermore, there is an accumulative exposure of RVR during the project process, especially in preconstruction and operation. This paper sheds light on the significance of lifecycle management on RVR and provides a practical approach for measuring RVR and implementing sustainable practice in highway or other transportation PPP projects.vi
dc.language.isoenvi
dc.publisherHindawi Limited,vi
dc.subjectInformation systemsvi
dc.subjectFuzzy setsvi
dc.subjectConstruction industryvi
dc.subjectCivil engineeringvi
dc.subjectLife cycle analysisvi
dc.subjectResponsibilitiesvi
dc.subjectFactor analysisvi
dc.subjectInfrastructurevi
dc.subjectTransportation servicesvi
dc.subjectOperations managementvi
dc.subjectRisk analysisvi
dc.subjectValue analysisvi
dc.subjectHighway constructionvi
dc.subjectLiterature reviewsvi
dc.titleProcess-Based Identification of Critical Factors for Residual Value Risk in China's Highway PPP Projectsvi
dc.typeOthervi
Bộ sưu tập: Bài báo_lưu trữ

Các tập tin trong tài liệu này:
Tập tin Mô tả Kích thước Định dạng  
BBKH1456_TCCN_Process-Based Identification of Critical.pdf
  Giới hạn truy cập
Process-Based Identification of Critical Factors for Residual Value Risk in China's Highway PPP Projects1.36 MBAdobe PDFXem/Tải về  Yêu cầu tài liệu


Khi sử dụng các tài liệu trong Thư viện số phải tuân thủ Luật bản quyền.