Vui lòng dùng định danh này để trích dẫn hoặc liên kết đến tài liệu này: http://thuvienso.vanlanguni.edu.vn/handle/Vanlang_TV/19107
Toàn bộ biểu ghi siêu dữ liệu
Trường DCGiá trị Ngôn ngữ
dc.contributor.authorLiu, Wen-
dc.contributor.authorZhai, Shihong-
dc.contributor.authorLiu, Wenli-
dc.date.accessioned2020-06-06T15:31:00Z-
dc.date.available2020-06-06T15:31:00Z-
dc.date.issued2019-
dc.identifier.issn1687-8086-
dc.identifier.issn1687-8094 (eISSN)-
dc.identifier.otherBBKH1449-
dc.identifier.urihttp://thuvienso.vanlanguni.edu.vn/handle/Vanlang_TV/19107-
dc.description"Hindawi Advances in Civil Engineering Volume 2019, Article ID 2045125, 19 pages https://doi.org/10.1155/2019/2045125"vi
dc.description.abstractA hybrid method consisting of bow-tie-Bayesian network (BT-BN) analysis and fuzzy theory is proposed in this research, in order to support predictive analysis of settlement risk during shield tunnel excavation. We verified the method by running a probabilistic safety assessment (PSA) for a tunnel section in the Wuhan metro system. Firstly, we defined the “normal excavation phase” based on the fuzzy statistical test theory. We eliminated the noise records in the tunnel construction log and extracted the occurrence probability of facility failures from the denoised database. We then obtained the occurrence probability of environmental failures, operational errors, and multiple failures via aggregation of weighted expert opinions. The expert opinions were collected in the form of fuzzy numbers, including triangular numbers and trapezoidal numbers. Afterwards, we performed the BT-BN analysis. We mapped the bow-tie analysis to the Bayesian network and built a causal network PSA model consisting of 16 nodes. Causes of the excessive surface settlement and the resulting surface collapse were determined by bow-tie analysis. The key nodes of accidents were determined by introducing three key measures into the Bayesian inference. Finally, we described the safety measures for the key nodes based on the PSA results. These safety measures were capable of reducing the failure occurrence probability (in one year) of excessive surface settlement by 66%, thus lowering the accident probability caused by excessive surface settlement.vi
dc.language.isoenvi
dc.publisherHindawi Limited,vi
dc.subjectMechanical propertiesvi
dc.subjectSubwaysvi
dc.subjectConstructionvi
dc.subjectFuzzy setsvi
dc.subjectBayesian analysisvi
dc.subjectProbabilistic methodsvi
dc.subjectRisk assessmentvi
dc.subjectStatistical testsvi
dc.subjectNoise reductionvi
dc.subjectFailurevi
dc.subjectFuzzy systemsvi
dc.subjectExcavationvi
dc.subjectNodesvi
dc.subjectNumerical analysisvi
dc.subjectAccidentsvi
dc.subjectSafety measuresvi
dc.subjectCollapsevi
dc.subjectEnvironmental protectionvi
dc.subjectStatistical analysisvi
dc.titlePredictive Analysis of Settlement Risk in Tunnel Construction: A Bow-Tie-Bayesian Network Approachvi
dc.typeOthervi
Bộ sưu tập: Bài báo_lưu trữ

Các tập tin trong tài liệu này:
Tập tin Mô tả Kích thước Định dạng  
BBKH1449_TCCN_Predictive Analysis of Settlement.pdf
  Giới hạn truy cập
Predictive Analysis of Settlement Risk in Tunnel Construction: A Bow-Tie-Bayesian Network Approach3.21 MBAdobe PDFXem/Tải về  Yêu cầu tài liệu


Khi sử dụng các tài liệu trong Thư viện số phải tuân thủ Luật bản quyền.