Vui lòng dùng định danh này để trích dẫn hoặc liên kết đến tài liệu này: http://thuvienso.vanlanguni.edu.vn/handle/Vanlang_TV/18838
Toàn bộ biểu ghi siêu dữ liệu
Trường DCGiá trị Ngôn ngữ
dc.contributor.authorJiang, Jianqing-
dc.contributor.authorLiu, Reqiang-
dc.date.accessioned2020-06-02T02:24:08Z-
dc.date.available2020-06-02T02:24:08Z-
dc.date.issued2019-
dc.identifier.issn1687-8086-
dc.identifier.issn1687-8094 (eISSN)-
dc.identifier.otherBBKH1132-
dc.identifier.urihttp://thuvienso.vanlanguni.edu.vn/handle/Vanlang_TV/18838-
dc.descriptionOne of the commonly used techniques to improve marine soft ground is the drainage consolidation method by plastic board drains (PBDs). But some complex marine soft ground will cause construction inconvenience of PBDs in certain areas of these sites, thus affecting the improvement effect. An alternative possible approach to overcoming these deficiencies may be the combination of PBDs and sand wick drains (SWDs) (i.e., composite prefabricated vertical drains (CPVDs)) as vertical drainage channels in the same site. In order to verify the suitability and performance of this method in marine soft ground improvement, a case study was performed based on the field monitoring and construction of the marine soft ground of an intercity express railway project in China. The construction procedure using the CPVD system, the field monitoring instrumentation scheme, and the design of fill surcharge level were described, and the field monitoring data were presented. The settlement characteristics, dissipation features of pore water pressure, and the horizontal movement pattern were assessed. In addition, predictions of ultimate settlement, postconstruction settlement, and consolidation degree were discussed by applying a modified hyperbolic model. The results show that the marine ground improved by the CPVD system is suitable for the construction of intercity express railway and high-speed railway. The improvement construction period of complex marine soft ground will be greatly shortened by the proposed parallel construction programme. This work will provide technical supports and application reference for the improvement of the similar marine soft ground.vi
dc.language.isoenvi
dc.publisherHindawi Limitedvi
dc.subjectLaboratoriesvi
dc.subjectConstructionvi
dc.subjectPore water pressurevi
dc.subjectClayvi
dc.subjectVertical drainsvi
dc.subjectDrainage channelsvi
dc.subjectPermeabilityvi
dc.subjectConsolidationvi
dc.subjectCase studiesvi
dc.subjectRailway engineeringvi
dc.subjectEnergy dissipationvi
dc.subjectDesign specificationsvi
dc.subjectWater pressurevi
dc.subjectShear strengthvi
dc.subjectMonitoringvi
dc.subjectHigh speed trainsvi
dc.subjectRailway constructionvi
dc.subjectEngineeringvi
dc.titleEffect of Improvement and Application of Composite Prefabricated Vertical Drain Method in Marine Soft Ground: A Case Studyvi
dc.typeOthervi
Bộ sưu tập: Bài báo_lưu trữ

Các tập tin trong tài liệu này:
Tập tin Mô tả Kích thước Định dạng  
BBKH1132_TCCN_ Effect of Improvement and Application.pdf
  Giới hạn truy cập
Effect of Improvement and Application of Composite Prefabricated Vertical Drain Method in Marine Soft Ground: A Case Study3.64 MBAdobe PDFXem/Tải về  Yêu cầu tài liệu


Khi sử dụng các tài liệu trong Thư viện số phải tuân thủ Luật bản quyền.