Vui lòng dùng định danh này để trích dẫn hoặc liên kết đến tài liệu này:
http://thuvienso.vanlanguni.edu.vn/handle/Vanlang_TV/18799
Toàn bộ biểu ghi siêu dữ liệu
Trường DC | Giá trị | Ngôn ngữ |
---|---|---|
dc.contributor.author | Zhao, Linlin | - |
dc.contributor.author | Wang, Bill | - |
dc.contributor.author | Mbachu, Jasper | - |
dc.contributor.author | Liu, Zhansheng | - |
dc.date.accessioned | 2020-06-01T10:59:35Z | - |
dc.date.available | 2020-06-01T10:59:35Z | - |
dc.date.issued | 2019 | - |
dc.identifier.issn | 1687-8086 | - |
dc.identifier.issn | 1687-8094 (eISSN) | - |
dc.identifier.other | BBKH1396 | - |
dc.identifier.uri | http://thuvienso.vanlanguni.edu.vn/handle/Vanlang_TV/18799 | - |
dc.description | "Hindawi; Advances in Civil Engineering; Volume 2019, Article ID 1362730, 15 pages; https://doi.org/10.1155/2019/1362730" | vi |
dc.description.abstract | Construction industry significantly contributes to New Zealand’s economic development. However, the delivery of construction projects is usually plagued by cost overruns, which turn potentially successful projects into money-losing ventures, resulting in various other unexpected negative impacts. The objectives of the study were to identify, classify, and assess the impacts of the factors affecting project cost in New Zealand. The proposed research model was examined with structural equation modelling. Recognising the lack of a systematic approach for assessing the influencing factors associated with project cost, this study identified 30 influencing factors from various sources and quantified their relative impacts. The research data were gathered through a questionnaire survey circulated across New Zealand construction industry. A total of 283 responses were received, with a 37% response rate. A model was developed for testing the relationship between project cost and the influential factors. The proposed research model was examined with structural equation modelling (SEM). According to the results of the analysis, market and industry conditions factor has the most significant effect on project cost, while regulatory regime is the second-most significant influencing factor, followed by key stakeholders’ perspectives. The findings can improve project cost performance through the identification and evaluation of the cost-influencing factors. The results of such analysis enable industry professionals to better understand cost-related risks in the complex environment. | vi |
dc.language.iso | en | vi |
dc.publisher | Hindawi Limited | vi |
dc.subject | Cost analysis | vi |
dc.subject | Contractors | vi |
dc.subject | Success | vi |
dc.subject | Modelling | vi |
dc.subject | Construction contracts | vi |
dc.subject | Construction industry | vi |
dc.subject | Construction costs | vi |
dc.subject | Civil engineering | vi |
dc.subject | Economic models | vi |
dc.subject | Literature reviews | vi |
dc.subject | Feasibility studies | vi |
dc.subject | Operations management | vi |
dc.subject | Economic development | vi |
dc.title | New Zealand Building Project Cost and Its Influential Factors: A Structural Equation Modelling Approach | vi |
dc.type | Other | vi |
Bộ sưu tập: | Bài báo_lưu trữ |
Các tập tin trong tài liệu này:
Tập tin | Mô tả | Kích thước | Định dạng | |
---|---|---|---|---|
BBKH1396_TCCN_New Zealand Building Project Cost.pdf Giới hạn truy cập | New Zealand Building Project Cost and Its Influential Factors: A Structural Equation Modelling Approach | 1.2 MB | Adobe PDF | Xem/Tải về Yêu cầu tài liệu |
Khi sử dụng các tài liệu trong Thư viện số phải tuân thủ Luật bản quyền.