Vui lòng dùng định danh này để trích dẫn hoặc liên kết đến tài liệu này: http://thuvienso.vanlanguni.edu.vn/handle/Vanlang_TV/18403
Toàn bộ biểu ghi siêu dữ liệu
Trường DCGiá trị Ngôn ngữ
dc.contributor.authorChong, Jiang-
dc.contributor.authorXie, Han-song-
dc.contributor.authorHe, Jia-li-
dc.contributor.authorWu, Wen-yan-
dc.contributor.authorZhi-chao, Zhang.-
dc.date.accessioned2020-05-29T01:42:55Z-
dc.date.available2020-05-29T01:42:55Z-
dc.date.issued2018-
dc.identifier.issn1687 - 8086-
dc.identifier.otherBBKH1042-
dc.identifier.urihttp://thuvienso.vanlanguni.edu.vn/handle/Vanlang_TV/18403-
dc.description"Hindawi Advances in Civil Engineering Volume 2018, Article ID 9215472, 9 pages https://doi.org/10.1155/2018/9215472"vi
dc.description.abstractAn analytical solution for the seepage field in water-filled karst tunnel is derived based on the inversion of complex function and groundwater hydraulics theory. The solution considers the distance between the tunnel and the cavern, the size of the cavern, and the properties of the lining structure, such as the permeability coefficient as well as the radius of the grouting ring. This paper also performed numerical simulations for two cases: the application of gravity and the absence of gravity. The numerical solution was obtained to verify the analytical solution, and a good agreement was found. Then, the effect of parameters is discussed in detail, including the distance between the tunnel and the cavern, the radius of the cavern, the grouting ring, and the initial support. The results show that when the radius of the cavern is constant, the pressure head and seepage flow decrease as the distance between the tunnel and the cavern increases. When the distance is constant, the pressure head and seepage flow increase with the increase of the radius of the cavern. In addition, the pressure head and the seepage flow decrease with the increase of the thickness of the grouting ring and decrease with the decrease of the permeability coefficient. As the thickness of the initial support increases, the pressure head gradually increases and the percolation decreases. Furthermore, due to the great influence of the grouting ring and initial support on the pressure head and seepage flow, the thickness and permeability coefficient of the grouting ring and initial support should be taken into account carefully during construction.vi
dc.language.isoenvi
dc.publisherHindawi Limitedvi
dc.subjectHydraulicsvi
dc.subjectKarstvi
dc.subjectPermeabilityvi
dc.subjectGroundwatervi
dc.subjectCoefficientsvi
dc.subjectSeepagevi
dc.subjectPressure headvi
dc.subjectFluid flowvi
dc.subjectGrain sizevi
dc.subjectComputational fluid dynamicsvi
dc.subjectPercolationvi
dc.subjectMechanicsvi
dc.titleAnalytical Solution of Seepage Field in Karst Tunnelvi
dc.typeOthervi
Bộ sưu tập: Bài báo_lưu trữ

Các tập tin trong tài liệu này:
Tập tin Mô tả Kích thước Định dạng  
BBKH1042_TCCN_ Analytical Solution of.pdf
  Giới hạn truy cập
Analytical Solution of Seepage Field in Karst Tunnel1.91 MBAdobe PDFXem/Tải về  Yêu cầu tài liệu


Khi sử dụng các tài liệu trong Thư viện số phải tuân thủ Luật bản quyền.